发布者: Guangdong Aucas Network Technology Co Ltd / 2023-05-20 / 2321 /
Characteristics of integrated cabling:
Comprehensive, good compatibility: the traditional professional wiring method needs to use different cables, wires, connection equipment and other equipment, the technical performance is very different, it is difficult to common with each other, incompatible with each other. The integrated cabling system has the characteristics of integrating all systems and compatible with each other, using optical cable or high-quality wiring components and connection hardware, can meet the needs of different manufacturers of terminal equipment to transmit signals.
Flexibility and adaptability: when using traditional professional wiring, if the location and number of terminal equipment need to be changed, new cables must be laid and new equipment must be installed. And in the construction process may occur signal transmission interruption or quality degradation, increase project investment and construction time, so the traditional cabling flexibility and adaptability is poor; In the integrated wiring system, any information point can connect different terminal equipment. When the number and location of the equipment change, only a simple plug process is needed, which is practical and convenient, its flexibility and adaptability are strong, and the project investment is saved.
It is convenient for future expansion and maintenance management: the integrated wiring system generally uses the star network structure, and each line is an independent system, which will not affect each other when rebuilding or expanding. All the wiring components of the integrated wiring system use the standard parts of building blocks and modular design. Therefore, the components are easy to replace, easy to troubleshoot, and the use of centralized management, conducive to analysis, inspection, testing and maintenance, saving maintenance costs, improve work efficiency.
Technical economy and reasonable: all parts of the integrated wiring system are made of high quality materials and standardized components, and in accordance with the standard construction and strict testing, to ensure that the technical performance of the system is excellent and reliable, to meet the current and future needs, and reduce maintenance work in maintenance management, saving management costs. Although the initial investment of the integrated wiring system is more, but on the whole it is in line with the requirements of advanced technology and reasonable economy.
The skills that integrated wiring must know:
In fact, the comprehensive wiring is not a difficult to understand the project, as long as you understand its principle, many comparison product performance will be able to make a cheap and good system.
1. The comprehensive wiring system must be designed in advance, and the installation projects such as civil construction, fire protection, air conditioning and lighting must be coordinated with each other to avoid unnecessary construction conflicts.
2. When conditions permit, the weak current should take its own weak current well to reduce the chance of electromagnetic interference. The floor wiring room and the main engine room should be arranged as much as possible to be larger for development and maintenance. For the network, the laying of the physical layer is crucial because it is the foundation.
3, as much as possible to deploy some points, the use of double-hole panel (a voice, a data), with electricity, in the vicinity of the information point distribution power points. Because the comprehensive wiring is generally a one-time project in place, the line layout is good, it is relatively difficult to change the wiring, and communication equipment is more and more with the development, so it is more safe to distribute some.
4, do not put the comprehensive wiring too idealized, do not put some of the more dedicated network is also integrated into the comprehensive wiring. It is enough to integrate telephone network, computer network and building automation network.
5, with the rapid development of network equipment, in the choice of programs should be as wide as possible, the horizontal use of five or more than five categories, to ensure that data and voice can be exchanged, vertical use of optical fiber to increase the logarithmic cable, for some points more buildings, should use optical fiber to do data backup rather than cable.
6, due to the price of optical products continues to decrease, the wide space wiring should consider more cloth some light spots, which is beneficial to the network construction.
7, laying DG pipe to use a larger diameter, to leave a margin. When laying optical cable, special attention should be paid to the turning radius, too small turning radius will lead to serious loss of the link, carefully check each cable, especially the panel box of the optical contact, some panel box depth is not enough, after the light point is done, the panel is not installed on the box, the test is not good after installation, the reason is that the cable corner radius is too small after installation, resulting in serious loss.
8. With the price reduction of optical splicing equipment, we can consider giving up the traditional ST and SC head production method, and use the tail fiber and fiber fusion to ensure the quality of the optical path.